Tuesday, March 31, 2009

Monday, March 30, 2009

Rebuilt Carburetor from Pony Carburetor

Pony Carburetors returned my Autolite 2100 Carb in AWESOME condition. I would recommend their service worth the $$ and peace of mind. Can't wait until put on motor!

Friday, March 27, 2009

Removed Convertible Top

Took out Convertible Top (frame) and removed Trim.

Organized Storage and Sorted Parts


Sorted new and old parts.

Thursday, March 26, 2009

Checking Parts that Ordered

Went through all the parts to check if had right stuff.

Unpacked the Truck and went through New Parts

Unloading Back of Truck Bed and Seat

Wednesday, March 25, 2009

15 Hour drive... later.. have a lot of Parts from Mustang Unlimted

Yes... you can fit a whole car in a full sized truck. We drove from Maine to Mustang Unlimited in Manchester, Connecticut. We picked most of parts left to finish car. Scott was a great help and going to sort everything tomorrow (with pictures to come)


  • Body
    • Fenders (L & R), Door Skins (L&R), Valences, Grill, Bumpers, Lights, Molding
  • Interior
    • Carpet, Molding, Armrests, Seatbelts
  • Engine
    • Hoses, Lines, Wire Harnesses
  • Brakes
    • Drums, Lines, Master Cylinder
  • Bolt
    • Exterior Master Fastener Kit
  • Weatherstriping
  • Suspension
    • Leaf Springs

Tuesday, March 24, 2009

Trunk Area and Front Engine Bay

Removed Part of Quarter Panels to get access to Trunk area to remove more sections to prep for trunk floor replacement.


Also continued to grind and weld areas to finish off the Engine Compartment.

Thursday, March 19, 2009

H&H Fastback

This the Fastback of Body Work Shop

Wednesday, March 18, 2009

Air Cleaner

Won Air Cleaner on Ebay. (If what says it is could be a good deal)


Mustang Unlimited

$219

Tuesday, March 17, 2009

Removed Heater Box and checked Cowl

Took out Heater box


and found the cowl is not rusted through and is sound

Monday, March 16, 2009

Welded in Panel in Engine Bay (Battery Tray Section)

Welded in the Engine Bay Panel to fix area where Battery was located.

Saturday, March 14, 2009

Welding in Floor Pans

Put new floor pans and welding them in.



video

video

Friday, March 13, 2009

New Replacement Steering Parts

MOOG replacement parts.

Cleaned Engine Compartment Prep For Painting

Continued to clean to get engine bay ready for painting.


video

Thursday, March 12, 2009

Wednesday, March 11, 2009

Cleaned Steering Box and Engine Compartment

Continued cleaning grease and grim out of engine compartment. Removed Engine Bay Braces and heater unit.

Tuesday, March 10, 2009

Inner Rocker Panel Drivers Side

Cut out old rocker panel, replaced with new one and then weld it in.


video

video

video

Monday, March 9, 2009

Cleaned Power Steering Pump Components

Removed Grease from Cylinder, Control Valve and Pump so can get ready to mail.


video

video

Saturday, March 7, 2009

Removed Springs, Steering, and Front Brakes.

Took out Springs and rest of steering parts. Removed Brake Drums as well.

Friday, March 6, 2009

Removed Power Steering



Also removed Power Steering Components (Cylinder & Control valve)


Sending out these units to Randle Meyer (Stanger53) to rebuild them
www.stangerssite.com

Driver side rockers

Cut out old rocker panel and welded in seat pan on passenger side.


video

Thursday, March 5, 2009

Welding Inner Rocker (Passenger Side)

Welded in Inner Rocker and torque box for Passenger Side of Car. (See Floor Pans)



video

video